Kitchen Remodeling in Houston, TX
One contractor, one schedule, and a kitchen that works the way you cook.
Kitchen remodeling for Greater Houston homes, with layout, cabinets, countertops, surfaces, and utilities handled as one job by one crew.

Kitchen remodeling in Houston, handled in the right order
A kitchen remodel touches more of the house than any other room. Cabinet layout decides where the plumbing and electrical land. Countertops wait on level cabinets. Backsplash waits on countertops. Flooring, paint, and lighting wait on all of it.
When four different subcontractors each own one piece, the gaps between them are where the delays and the mistakes live. AllPhase Contracting Group runs kitchen remodeling across Greater Houston as one scope with one point of contact, so each trade starts when the last one is actually done.
Full kitchen remodel or a targeted update
Some kitchens need everything: new layout, new cabinets, moved plumbing, the works. Most do not. Refacing solid cabinets, replacing the countertops, adding a backsplash, and fixing the lighting can change how a kitchen feels for a fraction of a full remodel.
The free walkthrough is where we sort out which version makes sense for your house and your budget. The estimate gets written around that answer, itemized, so you can trade scope for dollars before anything is demolished.
Cabinets, cabinet refacing, and countertops
New cabinets make sense when the layout changes, the boxes are damaged, or you need storage the current kitchen cannot give you. Cabinet refacing makes sense when the boxes are square and solid and the doors are the problem: new doors, drawer fronts, and hardware at a much lower cost than replacement. We will tell you which one your kitchen qualifies for.
Countertops come in quartz, granite, and solid surface, templated after the cabinets are set and level. Islands get seating, storage, and the electrical they need, because an island without an outlet is just a large cutting board.
Layout, storage, and the way you actually cook
Before anyone picks a tile, we talk about the routine. Where do groceries land? Where does prep happen? Which drawer is always in the way? Those answers shape the cabinet plan, the island size, and where the outlets and lights go. A kitchen planned around habits feels bigger than the square footage says it should.
Flooring, paint, trim, and the finish work most remodels skip
A kitchen is finished when the flooring meets the baseboard cleanly, the paint is done, and the trim is caulked, and not a day before. AllPhase handles that finish work on the same schedule, including flooring installation and interior painting in the rooms that connect to the kitchen, so the new room does not stop at the doorway.
Kitchen and bath remodeling, planned together
Many Houston homeowners remodel the kitchen and a bathroom in the same season, because the trades overlap and the disruption happens once. If a bathroom remodel is on the list, the two scopes get one schedule. And if the cooking you care about happens outside, a custom outdoor kitchen is built by the same crews with the gas, water, and power planned from the start.
Selections, lead times, and why kitchens stall
Cabinets, countertops, tile, and fixtures all have order times, and a missed selection is the most common reason a kitchen project sits idle with the sink in the garage. The plan lists every choice with the date it is needed. If you want guidance, we recommend options that fit the room instead of handing you a catalog.
Kitchen remodeling contractors for Cypress, Katy, and the rest of Greater Houston
AllPhase remodels kitchens across Greater Houston from its base in Cypress. Kitchen remodeling in Katy tops the calendar, followed by The Woodlands kitchens from the 1990s and 2000s, the Spring Branch ranch houses that want a wall taken down, and Sugar Land kitchens in First Colony and Telfair. Spring, Tomball, Conroe, Kingwood, Humble, Bellaire, and North Houston are covered too. Send photos of the current kitchen and your ZIP code, or start with a free kitchen walkthrough and we will talk through the scope on site.
Start with the property in front of us.
Tell us what needs attention. We will begin with a practical conversation, not a sales script.
A clear next step at every phase.
Construction feels manageable when the handoffs are visible.
Study the workflow
Review the room, the problem areas, storage needs, and how the kitchen is used day to day.
Define the scope
Coordinate layout, selections, lead times, and the work plan in writing before removal starts.
Sequence the build
Manage removal, rough in, cabinets, countertops, surfaces, fixtures, and finish work in order.
Complete the walkthrough
Review the finished kitchen together against the written scope and close out the remaining details.
The project record will do the talking.
Recent projects related to this service across Greater Houston. Browse the work, then tell us about yours.
What it is like to work with AllPhase.
Reviews from Greater Houston homeowners and property owners.
Serving Cypress and Greater Houston.
Based in Cypress, with work across northwest Houston and beyond. Check the service area pages or send your ZIP code to confirm coverage.
Questions before the walkthrough?
If the answer depends on your property or your insurance policy, we will say so.
How much does a kitchen remodel cost in Houston?
Cabinet choice, countertop material, whether plumbing or electrical moves, and the size of the room are the biggest factors. The free estimate itemizes each so the scope can be adjusted before work begins.
How long does a kitchen remodel take?
A cabinet and countertop update usually takes two to three weeks. A full remodel with layout changes typically runs four to eight weeks once materials arrive. The plan sets the schedule after selections are confirmed.
Is cabinet refacing a good option?
When the cabinet boxes are solid and square, refacing gives you new doors, drawer fronts, and hardware at a lower cost than replacement. If the boxes are damaged or the layout needs to change, new cabinets make more sense.
Can I use my kitchen during the remodel?
Partially. Water and power are shut off in stages, and we tell you ahead of time which days the sink and appliances will be unavailable so you can plan around them.
Do I need permits for a kitchen remodel in Houston?
Moving plumbing, adding circuits, or changing walls usually requires permits, depending on whether the home is inside Houston city limits or in unincorporated Harris County. We coordinate what applies and build it into the schedule.
Do you handle countertops, backsplash, and flooring, or just cabinets?
All of it. Cabinets, countertops, islands, backsplash tile, flooring, paint, trim, lighting, and the plumbing and electrical coordination that goes with them are handled as one scope by one crew.

Start with the property in front of us.
Tell us what needs attention. We will begin with a practical conversation, not a sales script.